Platform & Sandbox
Platform Architecture Knowledge Graph Engine Change Simulator Regulatory Intelligence Evidence Verifier Interactive CardioSense Sandbox
Solutions
Master Solutions Hub MedTech Startups Enterprise MedTech AI & SaMD Devices Regulatory Affairs Engineering & R&D Quality Assurance
Ecosystem & Resources
Integrations Ecosystem Technical Whitepapers (6) Comprehensive FAQ (27 Q&A) Security & Trust About Primexia Schedule a Briefing
Global MedTech Operations • Multi-Site Submission Resilience

Unified Regulatory Intelligence for Multi-Site Global Portfolios

Tier-1 MedTech manufacturers manage hundreds of device families across conflicting regional jurisdictions. PMX OS overlays your existing PLM, ERP, and QMS infrastructure to instantly quantify regulatory exposure when components change or global standards shift.

The Enterprise Dilemma

When a $0.40 Component Halts Global Shipments

Supply chain obsolescence in medical technology is not an inventory problem—it is a cross-jurisdiction regulatory emergency.

Legacy Silos Across M&A

Decades of corporate acquisitions leave global manufacturers with heterogeneous stacks: Teamcenter in cardiac, Windchill in orthopedics, SAP globally, and multiple local quality systems.

Conflicting Regional Filings

A component modification deemed a simple "Letter to File" in the US may constitute a "Substantial Modification" under EU MDR Article 120 or trigger an 18-month partial review with PMDA Japan.

Surveillance Audit Scramble

Notified Bodies (BSI, TÜV SÜD, DEKRA) conducting annual surveillance audits demand complete, uncompromised traceability between design baselines and manufacturing records across all sites.

Enterprise Integration Philosophy

The Non-Destructive Knowledge Graph Overlay

Enterprises cannot afford multi-year, nine-figure "rip-and-replace" IT migrations. PMX OS sits directly atop your operational systems of record:

  • ✔ PLM Ingestion: Connects to PTC Windchill, Siemens Teamcenter, and Dassault ENOVIA via federated API connectors to parse Multi-Level BOMs and CAD metadata.
  • ✔ ERP Synchronization: Queries SAP S/4HANA or Oracle Cloud SCM for plant-specific part usage, supplier obsolescence notices, and lot distributions.
  • ✔ QMS Binding: Bi-directionally links to Veeva Vault QMS, MasterControl, or Arena to attach CAPA investigations, ECOs, and approved test protocols.
Inspect All Supported Integrations →

Cross-Jurisdiction Change Analysis

How PMX OS evaluates Change Request CHG-1024 across primary global regulatory authorities:

Jurisdiction Classification Required Filing Pathway
United States (FDA) Class II (510k) Letter-to-File (REQ-0184 verified)
European Union (MDR) Class IIb (CE) Article 120 Assessment (NB Review)
Japan (PMDA) Class II (Shonin) Minor Modification Notice
Canada (Health Canada) Class III (MDL) Annual Notification Update
Calculated dynamically via PMX OS Regulatory Intelligence Engine based on transducer S-22 thermal parameters.
Enterprise Benchmark

CardioSense Pro: Multi-Site Component Obsolescence Case

Traced across 3 manufacturing sites (Minneapolis, Galway, Singapore) and 12 registered markets.

Event Trigger

Single-Source Transducer Obsolescence

The global procurement team flags that supplier Y has discontinued thermistor S-18. In the ERP system, S-18 is linked to finished good assembly ASM-9022 (CardioSense Pro v3.8.2).

Without PMX OS, regulatory managers in each region would spend 4–6 weeks independently pulling down regional registration binders, requesting CAD drawings from Windchill, and conducting uncoordinated risk assessments.

Enterprise Impact Blast Radius
• Direct Bill of Materials: Substituted S-18 with S-22 across 3 active plants
• Clinical Safety Requirement: REQ-0184 (IEC 60601-1-11 surface limit ≤41.0°C)
• Risk Management File: RSK-0044 (Thermal skin injury)
• Design Verification Test: Bench Protocol V-0183 (Executed & Passed)
• Global Dossier Output: Unified delta package exported for 12 local affiliates in 48 hours
Enterprise Dimension Disconnected Legacy Environment PMX OS Connected Knowledge Graph
Change Scoping Time Weeks of manual document searches across Windchill, SAP, and PDFs Instant deterministic blast radius traversal across all product trees
Cross-Border Filing Accuracy High risk of regional divergence and unnotified market shipments Synchronized multi-jurisdiction regulatory decision trees and filing guidance
Notified Body Audit Prep 3–4 weeks of manual document gathering and trace matrix remediation Push-button, cryptographically verified audit package generation
Supply Chain Downtime Risk Production holds due to delayed regulatory sign-offs on component swaps Continuous verification of alternate components before supply disruption hits
Enterprise Engagement

Scale Global Regulatory Compliance with Mathematical Defensibility

Empower your cross-functional engineering, quality, and regulatory organizations with a single shared truth.