Run Simulation
Intelligence Modules
Cybersecurity Lifecycle Manufacturing Intelligence Post-Market Surveillance AI Governance & GMLP Evidence Intelligence
Platform & Engines
Regulatory Digital Twin Decision Simulator Portfolio Command Center 9 Specialized AI Agents
DECISION SIMULATOR CHG-1024 Impact Analysis 21 CFR 820.30(i) 7-Dimension Trade-Off

What if we make this decision? Simulate outcomes before committing engineering resources.

In regulated medical device engineering, a seemingly routine component substitution can silently trigger months of bench testing, clinical amendments, and multimillion-dollar regulatory supplements. PMX OS Decision Simulator empowers cross-functional teams to stress-test decisions across 7 critical dimensions before formal Engineering Change Order (ECO) execution.

Run Live Impact Simulation Explore 7-Dimension Comparative Matrix
Change Order ID
CHG-1024
CardioSense Pro v3.8.2 • ECO In Review
Lead Time Optimization
34w → 6w (↓ 82%)
Supplier Y (34w) vs Supplier Alpha (6w)
Regulatory Pathway
Special 510(k)
30-Day FDA Review (Avoids Traditional 90-Day)
Total Impacted Objects
23 Entities
Requirements, Risks, Verifications, Submissions
AUTOMATED TRACEABILITY PROPAGATION

Live Change Impact Engine: CHG-1024

Execute the PMX OS graph traversal engine to trace how replacing temperature sensor S-18 with digital transducer S-22 propagates across hardware, firmware, risk controls, and regulatory filings.

COMPREHENSIVE DECISION TRADE-OFF

Side-by-Side Comparative Simulation: Baseline vs Proposed

Evaluating Baseline Sensor S-18 (MicroSens analog thermistor) versus Proposed Sensor S-22 (OmniSem digital I2C transducer) across the 7 dimensions of medical device lifecycle feasibility.

Dimension Baseline: Sensor S-18 (MicroSens Analog) Proposed: Sensor S-22 (OmniSem Digital) Impact
1. Cost Profile Unit BOM: $14.20. High assembly overhead due to external analog signal conditioning circuit and precision op-amp. Unit BOM: $11.85. Saves $2.35/unit. One-time non-recurring engineering (NRE) test re-verification cost of $185,000. +Net ROI
2. Timeline & Supply Lead time extended to 34 weeks due to sole-source raw material delays at Supplier Y. Critical inventory depletion risk in Q4 2026. Lead time: 6 weeks from Supplier Alpha (OmniSem, dual-fab sourcing). 16-week re-verification & submission cycle. Saves 28w
3. ISO 14971 Risk Profile Prone to analog temperature resistance drift (RSK-0051) and thermal burn injury (RSK-0044) if lot sintering deviates (+3.2%). Integrated digital ADC eliminates analog drift. Introduces I2C digital bus timeout hazard (RSK-0092), mitigated via RTOS watchdog. Net Safe
4. Regulatory Filing Cleared under FDA 510(k) K240982 and EU MDR Technical Documentation Rev 3. Fully authorized commercial predicate. Determined as FDA Special 510(k) (30-day review) under K97-1 flowchart. EU MDR Annex II Section 4.2 Technical File supplement. Supp Req
5. Verification Burden All historical verification protocols executed and locked. Baseline evidence EV-0183-A verified in 2024. Invalidates 5 protocols: V-0183 (36h thermal stress), V-0201 (EMC radiated immunity for I2C clock), V-0204 (drop test), V-0215 (aging). 5 Protocols
6. Clinical Validation Validated in 240-patient clinical investigation CS-088 for skin integrity and temperature measurement accuracy. Zero human trials required. Sensor housing polycarbonate remains identical; clinical team files bench equivalence addendum. Zero Trials
7. Cybersecurity Surface Zero digital addressable registers. Immunity to digital bus command injection; vulnerable only to ADC line noise. Exposes I2C digital registers over internal serial bus. Requires cryptographic frame signing under SEC-CTRL-19. SEC Control

Interactive Parameter Sensitivity & ROI Calculator

Simulate how annual manufacturing batch volume and environmental test chamber concurrency alter the net financial breakeven point and time-to-market.

20k 100k 250k
1 (Sequential) 2 (Standard) 4 (Parallel)
Gross Annual BOM Savings
$235,000
@ $2.35 unit delta
Year-1 Net Financial ROI
+$50,000
After $185k NRE cost
Total Testing Time
6.5 Weeks
5 Verification protocols
Time to Commercial Ship
10.8 Weeks
Testing + Regulatory clearance